 |
|
Remodel the Indian Creek parking lot |
 |
|
Brick tuckpointing at Wilkins and Indian Creek |
 |
 |
|
Drainage tiling, flooring and kitchen air conditioning at Bowman
Woods |
 |
|
Installation of additional sidewalk at Linn Grove and Echo Hill |
 |
|
New fire hydrant valves at Westfield |
 |
|
Upgrade the sewer lines at the High School and Learning Resource
Center |
 |
 |
|
Remodel and repair locker rooms and restrooms in the High School |
 |
|
Auditorium flooring replacement |
 |
|
Replace a boiler and HVAC unit at the High School |
 |
|
Repair a portion of the High School roof |
 |
|
Demolition of Armstrong Field |
 |
|
Concrete and asphalt repairs across the District |